The acceptance protocol of four WILPO C 532hc systems being a part of a new investment in Kozienice Power Plant (belonging to the Enea Group), was signed on 21.12.2017. The implemented devices are the part of the stoking system of a newly built power block of 1075 MW which was put into operation on 19.12.2017.
The fully calibrated measurement systems provide on-line monitoring of the quality parameters of coal delivered to the new power block by the two transport galleries.
Back to top